Bandersnatch 2024
GnuBreed 2024
Captain Hate 2023
moon_over_vermont 2023
westminsterdogshow 2023
Ann Wilson(Empire1) 2022 Dave In Texas 2022
Jesse in D.C. 2022 OregonMuse 2022
redc1c4 2021
Tami 2021
Chavez the Hugo 2020
Ibguy 2020
Rickl 2019
Joffen 2014
AoSHQ Writers Group
A site for members of the Horde to post their stories seeking beta readers, editing help, brainstorming, and story ideas. Also to share links to potential publishing outlets, writing help sites, and videos posting tips to get published.
Contact OrangeEnt for info: maildrop62 at proton dot me
Which would be a bigger deal if Intel hadn't been rejecting warranty returns for the past year, all the while knowing that the problems were of its own creation.
These are needed to replace the fault-ridden 13th and 14th generation chips. Meteor Lake actually has multiple chips on the package, similar to some AMD CPUs, and the problem lies with the components manufactured by Intel itself.
The response has been to crank up production - since Intel owns the factories, it can do that - and discard the failed parts. That will allow Meteor Lake to launch on time but it will not come cheap.
These are great because they use much less power than a 10Gb card, are twice as fast as common 2.5Gb Ethernet, and run just fine over twenty year old Cat-5 cables.
They are less great because 5Gb Ethernet switches basically do not exist.
There is a SpaceX Crew Dragon capsule docked at the ISS right now, but that's the lifeboat in case of catastrophic failure, so the plan would be to send up a second capsule to ferry Butch and Suni home.